Stuttgart-Ulm rail project, Filstal bridge
|
Infrastruktur
As part of the extension of the Stuttgart - Ulm railroad line, the Filstal valley has to be crossed. Two partial bridges, each almost 500 m long and 85 m high, are currently being built. This makes the Filstal Bridge the third highest railroad bridge in Germany. The route is an important link in the European high-speed rail network.
We are significantly involved with these BETOMAX® quality solutions:
COMAX®, fiber-reinforced concrete spacers